Highlighting Zero Dollar Phases In The Estimate Sheet
BidMatrix allows you to highlight items on the Estimate Sheet
that have a zero dollar total. To highlight zero dollar items on the
Estimate Sheet, click on the Highlights
option on the Estimate Sheet toolbar. Next, check the box labeled Zero Dollar Items.
The Estimate Sheet will then highlight every item with a zero dollar total, including the
over-lines where that item is showing up, given your current sort groupings.
Related Articles
Highlighting Zero Dollar Phases In The Summary Sheet
BidMatrix includes an option to highlight phases that do not have a dollar value. This option is available in both the Summary Sheet as well as inside each bid package matrix. To use this option on the Summary Sheet, click on the Highlights option on ...
Adding Phases to a Bid Package From the Summary Sheet
There are three places that phases can be added to a bid package. You can add phases to a bid package from the Summary Sheet, and phases can also be added to a bid package from within a bid package matrix. Additionally, phases can be added using the ...
Importing An Estimate From Trimble/WinEst
Importing a named.est file from WinEst To import a “native” WinEst estimate file, you must first install the Skybridge application. The Skybridge application will allow BidMatrix, a Cloud application to communicate with the WinEst desktop ...
Exporting an “as bid” estimate to Trimble / WinEst
BidMatrix includes an option to create a new Trimble / WinEst “as bid” estimate from BidMatrix. The following are prerequisites for creating a Trimble / WinEst estimate from BidMatrix: The BidMatrix Skybridge application must be installed and be ...
Exporting an “as bid” estimate to Sage / Timberline
BidMatrix includes an option to create a new Sage / Timberline “as bid” estimate from BidMatrix The following are prerequisites for creating a Sage / Timberline estimate from BidMatrix: The BidMatrix Skybridge application must be installed and be ...