Exporting an “as bid” estimate to Sage / Timberline
BidMatrix includes an option to
create a new Sage / Timberline “as bid” estimate from BidMatrix
The following are prerequisites
for creating a Sage / Timberline estimate from BidMatrix:
- The BidMatrix Skybridge application must be
installed and be active (see Installing Skybridge to learn more about
Skybridge)
- The BidMatrix estimate being used to create a Sage
/ Timberline estimate was created by first importing a Sage / Timberline
estimate.
To create a new Sage /
Timberline estimate from BidMatrix select the “Closeout” option on the
BidMatrix Summary Sheet toolbar.
After the “Closeout” is complete,
a new Sage estimate will be created with the same name as the project name used
in BidMatrix.
The new Sage estimate will include
the original Sage estimate items, but the pricing and totals for those items
will reflect the pricing, totals, and selected subcontractors coming from
BidMatrix.
Items that were “self perform”
items, meaning they were associated with phases that were not assigned
subcontractors in BidMatrix, will reflect the original category costs that were
part of the original Sage estimate.
Related Articles
Importing An Estimate From Sage/Timberline Estimating
BidMatrix allows you to import budgetary estimates created in the Sage / Timberline estimating. You can use these budgetary estimates to compare your budgets for each bid package and bid package phase against the budgets you receive from ...
Exporting an “as bid” estimate to Trimble / WinEst
BidMatrix includes an option to create a new Trimble / WinEst “as bid” estimate from BidMatrix. The following are prerequisites for creating a Trimble / WinEst estimate from BidMatrix: The BidMatrix Skybridge application must be installed and be ...
Viewing a Bid Package Phase Scope
When importing an estimate from Sage / Timberline, Trimble / WinEst, or Excel, the estimate you import may include items within each bid package. Each item would have an item code, and item description, takeoff quantity, and budget amount. This item ...
Bid Package Budget Column
The bid package matrix always includes a budget column. The budget for each bid package phase can be populated during the estimate import process, assuming the estimate that you import includes dollar values for each bid packages. For bid packages ...
Importing An Estimate From Trimble/WinEst
Importing a named.est file from WinEst To import a “native” WinEst estimate file, you must first install the Skybridge application. The Skybridge application will allow BidMatrix, a Cloud application to communicate with the WinEst desktop ...