Changing the Summary Sheet Column Order

Changing the Summary Sheet Column Order

To change the order of the columns on the Summary Sheet, click on the column label. Hold down the left mouse button and drag the column to the desired location. BidMatrix will remember this column order then next time you enter the project Summary Sheet
    • Related Articles

    • Changing the Subcontractor Order in the Matrix

      To change the order of the subcontractors in the matrix, click in the subcontractor name column header, hold the left mouse button down, and drag the column to the desired position.
    • Printing the Summary Sheet

      To print the Summary Sheet, click on the Print option on the Summary Sheet toolbar.
    • Highlighting Zero Dollar Phases In The Summary Sheet

      BidMatrix includes an option to highlight phases that do not have a dollar value. This option is available in both the Summary Sheet as well as inside each bid package matrix. To use this option on the Summary Sheet, click on the Highlights option on ...
    • Adding Phases to a Bid Package From the Summary Sheet

      There are three places that phases can be added to a bid package. You can add phases to a bid package from the Summary Sheet, and phases can also be added to a bid package from within a bid package matrix. Additionally, phases can be added using the ...
    • Adding a Bid Package to the Summary Sheet

      To add a bid package(s) from the Summary Sheet, you can either click on the ellipsis on the Base Bid row, or right mouse click on the "Base Bid" phrase description in the column titled "Grouping". See screenshots below: Ellipsis View Right Mouse ...