Adding Alternates to a Bid
You can add an unlimited number of Alternates to each project. To add an alternate(s) to the project. Click on the Alternates option in the Summary Sheet toolbar.
When you click on the Work Breakdowns option on the navigation panel, it will open a list of the work breakdowns that are currently have associated with this project. Alternate(s) is one of the default work breakdowns that will appear in the list for every project that is set up.
To add a new alternate, click on the Add Alternate option at the top of the page.
You will then be prompted to enter an alphanumeric code and a description for the new alternate.
Next, you can select which bid packages that are contained in the existing project are applicable to the new alternate. You can click individual bid packages from the list, or you can check the box for "Select All" and deselect those bid packages that are not applicable.
After adding the new alternate, you can then enter a quantity and unit of measure for the alternate. The quantity and unit of measure you enter will allow you to see the cost per unit for the alternate in the Summary Sheet overline for that alternate.
Related Articles
Adding Bid Package Clarifications
A list of clarifications, often referred to as inclusions & exclusions can be added to every bid package. To add / manage bid package clarifications, click on the Clarifications tab at the bottom of the bid package page. To manually add a ...
Activating and Deactivating Project Alternates
In addition to the base bid, your bid may also contain multiple Alternates. In some cases you may want to review your bid with some of the Alternates not contributing to the bid totals. In this case you would want to deactivate the Alternate so that ...
Adding Subcontractors to a Bid Package
To add a subcontractor to a bid package matrix, click on the + Add Subcontractor option on the bid package toolbar. This will bring up the Add Subcontractor Window. The first option in the Add Subcontractor window is Search for Subcontractors. This ...
Adding a Bid Package to the Summary Sheet
To add a bid package(s) from the Summary Sheet, you can either click on the ellipsis on the Base Bid row, or right mouse click on the "Base Bid" phrase description in the column titled "Grouping". See screenshots below: Ellipsis View Right Mouse ...
Adding Bid Package Phase Notes
To add a note to a bid package phase, click on the ellipsis icon to the left of the bid package phase code or right mouse click on any cell on the overline for the bid package phase. Next, click on the Notes option to enter the note. You can format ...