Adding a Bottom Line markup with steps, ie; Bond Markup

Adding a Bottom Line markup with steps, ie; Bond Markup

BidMatrix allows you to include Bottom Line markups with stepped percentages. This is often required when you need to create a bond markup for the project. Bottom Line markups with step percentages will calculate amounts based on the different percentages you set up at each step, and because it is a "bottom line" markup, it will include the markup amount when calculating the project gross total.

 

To add a Bottom Line markup with percentage steps, click on the Totals / Markups option on the Summary Sheet toolbar. Next, right mouse click on any row in the Totals / Markups panel and select Insert New Below or Insert New Above. This will bring up the Add Markup window. In the Add Markup Window, type in a description for the new markup and then choose Bottom Line for the markup Type. After choosing Bottom Line for the type, check the box labeled Use Stepped Percentages. Next, enter the amount and the percentage for each step.

 

This is an example of a Bottom Line markup which includes three steps. The first step will calculate at 1.25% of the first $300,000, the second step will calculate at 1.0% of the first $1,00,000 less the previous step amount, which would be 1.0% of the next $700,000. The third step is .75% of $10,000,000 less the previous step amount, which would be .75% of $9,000,000.





    • Related Articles

    • Adding a Bottom Line Markup

      Bottom Line markups are markups that are always calculated on the gross total for a project, and the bottom line markup includes it's calculated amount in the gross total.  To add a Bottom Line markup, click on the Totals / Markups option on the ...
    • Adding a Percent Markup

      To add a Percent Markup, click on the Totals / Markups option on the Summary Sheet toolbar. Next, right mouse click on any row in the Totals / Markups panel and select Insert New Below or Insert New Above. This will bring up the Add Markup window. In ...
    • Adding a Lump Sum markup

      To add a Lump Sum markup click on the Totals / Markups option on the Summary Sheet toolbar. Next, right mouse click on any row in the Totals / Markups panel and select Insert New Below or Insert New Above. This will bring up the Add Markup window. In ...
    • Adding Bid Package Clarifications

      A list of clarifications, often referred to as inclusions & exclusions can be added to every bid package. To add / manage bid package clarifications, click on the Clarifications tab at the bottom of the bid package page.  To manually add a ...
    • Accessing the Totals / Markup panel to add a markup

      Markups are added to the bid from the project Summary Sheet. To add a markup to the bid, click on the Totals/Markups option on the Summary Sheet toolbar. Clicking on the Markups option will bring up a panel on the right hand side of ...